This page requires javascript. Otherwise you are not able to see all the nice content.
Installation, equipping and commissioning of grease storage units, connection to heating systems and receiving station setup
Installation of CHP plants, setting up the peripheral plant components such as chimney stack heating connection, emergency cooling, gas connection, supply and exhaust air installations
Water-level guided floating clean water removal device for large discharge quantities up to 1,500 m³/h with optimum process integration and turbidity-dependent control of clean water outflow
Automatic clean water removal from SBR and sedimentation tanks with compact design for discharge quantities up to 300 m³/h
Floating, vertically acting agitator with flow-optimised arrangement in the tank
Disc filter system for retaining fine and coarse substances from flowing liquids
Floating, vertical extraction with flow-optimised design, constant removal of floating sludge independent of the wastewater level
Effective solution for the removal of floating sludge
Turbid water removal for sludge storage tanks with automatic detection of the turbid water zone
A mobile sewer flushing vehicle for resource-efficient cleaning of medium to large profile sewers requiring no external energy sources
Reliable, partially mobile flood protection system for diverting surface water and sewage during heavy rainfall